Parts List for the Blueprint Builds
By Jordan Stambaugh · Last updated October 30, 2026
This page lists every line of the three bills of materials in The DIY Off-Grid Solar Blueprint. A line links to a product only when my catalog has one that really fits its voltage and capacity. That is 5 of 30 lines. The rest stay as the spec to shop for, because a wrong-voltage link is worse than no link on a purchase this size.
I have not tested any of these products. Matches come from published specs, and catalog prices are indicative, so check the retailer before you buy. Run your own load audit first, since these are reference builds and your numbers decide what you need. The power calculator and solar sizing calculator are a quick way to check them.
Build A: The Weekender
12 V · 400 W · 2.56 kWh
About 950 Wh a day. Camp cabin, van or backup kit. This is the build the catalog covers best, because 12 V panels, controllers and batteries are what most of it holds. The inverter is the gap.
Parts total in the Blueprint: $1,650 to $2,450, from U.S. retail prices seen in September 2026, before tax, shipping and tools.
-
Solar panels
2 × 200 W rigid mono, 12 V class, wired in series
-
2 × Renogy 200W 12V Monocrystalline Solar Panel
The panel the Blueprint names. Listed Voc 23.0 V, Isc 11.05 A.
Catalog price each: $170
-
2 × HQST 200W Compact N-Type 16BB Solar Panel (HSP200N-64L)
Lower-priced rigid panel. Listed Voc 22.4 V, Isc 11.04 A, which still fits the 20 A PV breaker.
Catalog price each: $120
Buy two identical panels. Either pair below stays far under a 100 V controller limit, about 46 V before the cold-weather correction.
-
-
Charge controller
Victron SmartSolar MPPT 100/30 or equivalent: 100 V input, 30 A output
-
1 × Epever Tracer 3210AN 30A MPPT Charge Controller
Same 100 V and 30 A rating. Listed at 390 W on 12 V, so a 400 W array clips slightly at peak. No built-in Bluetooth.
Catalog price each: $83
-
1 × Victron SmartSolar MPPT 100/50
Same 100 V limit, built-in Bluetooth, more current than this array can use. Build A's 40 A fuse and 8 AWG wire are sized for a 30 A controller, so redo that circuit for 50 A.
Catalog price each: $280
-
-
Battery
12.8 V 200 Ah LiFePO4: one 200 Ah battery, or two 100 Ah in parallel
-
1 × LiTime 200Ah Plus 12V LiFePO4
200 Ah with a 200 A BMS. No built-in Bluetooth.
Catalog price each: $460
-
1 × Power Queen 12V 200Ah LiFePO4
200 Ah with a 100 A BMS, below Build A's 150 A main fuse, so the BMS can cut out before the fuse blows at a heavy load. No Bluetooth.
Catalog price each: $350
-
2 × LiTime 100Ah Mini 12V LiFePO4
Two in parallel make 200 Ah, with a 100 A BMS in each. Buy them together so they match.
Catalog price each: $200
All three list a 32°F low-temperature charge cutoff, so plan around that if the bank sits in an unheated space.
-
-
Inverter
1,000 W pure sine, 12 V, low idle draw
No catalog match. The smallest 12 V pure sine inverter I list is 2,000 W, which can pull about 185 A. Build A's 125 A fuse and 2 AWG inverter run are sized for 1,000 W, so it is not a drop-in swap.
-
Battery monitor
Victron SmartShunt 500 A
-
Main fuse
150 A Class T fuse with insulated holder
-
Disconnects
Battery switch, plus a 20 A DC PV breaker rated 150 VDC or higher
-
Distribution
Busbars, DC fuse block, branch fuses
-
Wire and terminations
1/0, 2, 8 and 10 AWG, PV wire, MC4 connectors, tinned lugs, heat shrink
-
Mounting
Roof or rack mounts, backer board, strain reliefs
Build B: The Cabin / RV
24 V · 1,200 W · 5.12 kWh
About 3 kWh a day. Part-time living with generator backup. Two lines match here, and both come with conditions. Read the notes before buying, because each one changes something in the build.
Parts total in the Blueprint: $3,500 to $5,400, from U.S. retail prices seen in September 2026, before tax, shipping and tools.
-
Solar panels
3 × 400 to 415 W rigid mono, wired in series. The Blueprint's worked example uses Voc 37.1 V and Isc 13.9 A.
No catalog match at this budget. The one 400 W rigid panel I list costs several times the Blueprint's $0.33 to $0.45 per watt, and its published Voc differs between sources. Whatever you buy, run the cold-weather voltage check with the Voc on that panel's label.
-
Charge controller
Victron SmartSolar MPPT 150/45: 150 V input, 45 A output
No catalog match. Do not substitute a 100 V controller: the Blueprint's three-panel string reaches about 127 V at −30°C, and every other MPPT I list tops out at 100 V. The Victron 150/35 has the voltage but is listed at 1,000 W on 24 V, short of this 1,200 W array.
-
Battery
25.6 V 200 Ah LiFePO4 (5.12 kWh)
-
2 × in series LiTime 200Ah Plus 12V LiFePO4
200 A BMS, above this build's fuse rating. No built-in Bluetooth.
Catalog price each: $460
-
2 × in series Redodo 12V 200Ah Plus LiFePO4
200 A BMS, above this build's fuse rating. No Bluetooth.
Catalog price each: $400
I list no 24 V battery. Two 12.8 V 200 Ah batteries in series give the same 25.6 V and 200 Ah. The catalog marks both models below as series-capable, but the Blueprint's rule still applies: use a matched pair, confirm the maker allows series use in its manual, and never tap 12 V from the middle of the string. The DC-DC converter below handles 12 V loads.
-
-
Inverter-charger
Victron MultiPlus-II 24/3000 120 V
-
1 × Sigineer 3000W 24V Inverter-Charger
Listed as 24 V input, 3,000 W continuous, 120 V output with a transfer switch. 2-year warranty and no Bluetooth or Wi-Fi. Sources disagree on its surge and charger ratings, so check the data plate for the unit you buy.
Catalog price each: $600
The Blueprint's MultiPlus-II figure is about 2,400 W continuous, or 111 A. At a full 3,000 W the Sigineer draws 3,000 ÷ (24 × 0.9) = 139 A. Add the 15 A DC-DC load and multiply by 1.25, and the main circuit needs about 193 A, more than the 175 A Class T and 2/0 cable on Plate 05. That points to a 200 A Class T on 3/0 AWG, subject to the inverter manual. The Victron MultiPlus I list is the 12 V model, so it does not fit this 24 V bus.
-
-
Battery monitor
Victron SmartShunt 500 A
-
Main fuse
175 A Class T with a holder rated for the current. See the inverter-charger note if you use a larger inverter.
-
Disconnects
Battery switch, plus a 25 A DC PV breaker rated 150 VDC or higher
-
DC-DC converter
24 V to 12 V, about 30 A, for 12 V loads
-
AC distribution
120 V subpanel, breakers, GFCIs, generator inlet
-
Wire and terminations
2/0, 6 and 10 AWG, PV wire, lugs, conduit
-
Mounting
Roof or ground racking for 3 panels
Build C: The Homestead
48 V · 4,800 W · 15.4 kWh
About 9 kWh a day. Full-time off-grid home with a 240 V well pump. Nothing in my catalog is a fair match for this build, so this section links no products. Every line is the spec to shop for.
Parts total in the Blueprint: $9,700 to $13,800, from U.S. retail prices seen in September 2026, before tax, shipping and tools.
-
Solar panels
12 × 400 to 440 W rigid mono, often sold by the pallet
No catalog match. Twelve panels at the price of the one 400 W rigid panel I list would far exceed this line's budget. Solar distributors selling by the pallet are the right place to shop.
-
All-in-one inverter
EG4 6000XP: 6 kW, 2 MPPT inputs, 480 V PV max, split phase
No catalog match. This build needs 120/240 V split phase for the well pump. The Growatt SPF 5000 ES is smaller at 5 kW, and its manual lists 230 V, 50 Hz output. The PowLand 12000W is twice the size this build's 175 A fuse and 2/0 cable were sized for.
-
Batteries
3 × EG4 LifePower4 48 V 100 Ah rack modules (UL 1973/9540)
No catalog match. I list no 48 V rack batteries, and a series string of 12 V batteries would lose the closed-loop communication with the inverter that this design relies on.
-
Rack and bus
Server rack or cabinet, bus box or busbars, comms cable
-
Main protection
175 A Class T plus a DC disconnect, or a listed breaker box
-
PV side
2 PV disconnects rated 600 VDC or higher, PV wire, conduit, MC4 connectors
-
AC side
Main panel and breakers, generator inlet, ground rod and clamp
-
Ground-mount racking
12-panel kit, or DIY steel or timber depending on the site
-
Monitoring
Battery and all-in-one app is built in. A shunt is optional.
Before you wire anything
- Your equipment manual and local code outrank this list and the Blueprint. If a manual calls for a different fuse or cable, follow the manual.
- In most of the U.S., a permanent system on a dwelling or outbuilding needs an electrical permit, and your local authority decides which NEC edition applies. Call them before you buy.
- Hire a licensed electrician for anything you are not sure about. For Build C, that includes the main panel and the 240 V well pump circuit.
- Any change to an inverter, controller or panel changes the fuse, wire and string math. Rerun it for the parts you actually buy. Series vs parallel panel wiring and series vs parallel battery wiring cover the basics.
Keep shopping