A generator for a well pump needs three things: 240 V output if the pump is 230 V, at least the minimum rating for your motor, and a transfer switch between it and your house wiring. Franklin Electric’s 2026 AIM manual lists 4 kW as the minimum for a 1 HP 3-wire motor and 6 kW for a 1 HP 2-wire motor, before anything else you plan to run. CPSC says never to power house wiring by plugging a generator into a wall outlet, and it warns that a generator used in a confined space can produce high levels of carbon monoxide within minutes. Those are the two ways this job can kill someone. I am a homeowner in Washington State reading the manuals. I have not tested a generator or power station on a pump.

Minimum generator size from Franklin’s table

You do not have to guess at this, because a submersible motor manufacturer prints it. The minimum ratings below are from page 7 of the 2026 AIM manual, and the locked rotor amps are from the 4-inch 230 V single-phase tables on pages 39 and 40. The last column is my own multiplication by 230 V, not a Franklin number. Franklin does not print starting watts.

MotorMin. generator, 3-wireMin. generator, 2-wireLocked rotor amps, 3-wire / 2-wireLocked rotor × 230 V, 3-wire / 2-wire
1/2 HP2 kW (2.5 kVA)3 kW (3.75 kVA)23 / 32.25,290 / 7,406 VA
3/4 HP3 kW (3.8 kVA)4.5 kW (5.7 kVA)34.2 / 40.77,866 / 9,361 VA
1 HP4 kW (5.0 kVA)6 kW (7.5 kVA)41.8 / 48.79,614 / 11,201 VA
1.5 HP5 kW (6.25 kVA)7.5 kW (9.375 kVA)51.4 / 66.211,822 / 15,226 VA
2 HP7.5 kW (9.4 kVA)Not listed53.1 / Not listed12,213 VA / Not listed

Your well record or pump installer should tell you whether the motor is 2-wire or 3-wire, and your nameplate outranks this table. These are Franklin’s motors, and another brand’s numbers can differ.

Why the generator number is smaller than the starting number

A 1 HP 3-wire motor can pull 9,614 VA at full voltage, yet Franklin’s minimum is 4 kW. The reason is on the same page: generators must be sized to deliver at least 65% of the motor’s rated nameplate voltage during starting. The generator’s voltage sags during the start, and Franklin accepts that down to the 65% line. It even says that using a minimum sized generator acts as a soft start to the motor, and that no additional voltage reduction is allowed.

A minimum rating is a floor for the motor alone, so a few more rules apply:

  • Add your other loads. The page I read does not say whether Franklin’s kW is a running or peak rating, so I would match it to the generator’s rated output, not the big number on the box. A well pump plus a refrigerator is not a well pump. SoftStart’s sizing sheet warns that starting both compressor and pump at once can overload a generator.
  • Start order matters. Franklin says to always start the generator before turning on the motor, and always turn off the motor before shutting down the generator. The motor thrust bearing may be damaged if the generator coasts down with the motor running or runs out of fuel.
  • Frequency matters. Motor speed follows generator frequency. Franklin says a pump 1 to 2 Hz below design will not meet its curve, and 1 to 2 Hz above may trip overloads.
  • Derate for elevation and fuel. Franklin points to the generator maker’s de-rating for higher elevations or natural gas. SoftStart’s sheet says dual-fuel generators produce at least 10% less wattage on propane.
  • Do not stack a soft starter on a minimum generator. Franklin says not to use a reduced voltage starter with a minimum sized generator, because both drop the output voltage and that can cause severe motor damage.

SoftStart sells an add-on starter and says 230 V pumps from 1/2 HP to 1 HP need a 120/240 V generator in the 4,000 to 5,000 W class. It also says the device reduces inrush only, not running current, and powers one pump and nothing else. That is a vendor’s claim. Ask your pump installer before you add one to your motor.

The 240 V requirement

Most of those motors are 230 V. In Franklin’s 4-inch single-phase table, 115 V appears only at 1/2 HP. A 230 V pump needs both legs of a 120/240 V output, so a generator with only 120 V outlets will not run it, however many watts it makes.

Read the outlets on the spec sheet before you buy. A 2014 Honda EU7000is sheet, as an example of what to look for, lists 120/240 V, 7,000 W maximum, 5,500 W rated, and a 30 A 125/250 V locking outlet. Check the current model’s manual, and note the gap between its maximum and rated figures. This site’s catalog has no generators, so I am not recommending one.

If you would rather not run an engine at all, a large 240 V power station is the other route, with limits covered further down.

Transfer switch and backfeed

This is the rule I will not soften. CPSC Publication 5123 says never try to power the house wiring by plugging the generator into a wall outlet, a practice known as backfeeding. It calls this extremely dangerous and an electrocution risk to utility workers and neighbors served by the same utility transformer, and says it bypasses some built-in household circuit protection. CPSC also warned in 2026 that male-to-male extension cords should never be used under any circumstances. Its 2022 warning says those cords are generally used to backfeed a home and can result in a fire.

The CPSC pages I read say what not to do. They do not spell out the transfer switch, so that part comes from other authorities:

  • OSHA: never attach a generator to a structure’s electrical system unless a qualified electrician has properly installed it with a transfer switch. Without one, the generator can energize wiring systems for great distances, which is an electrocution risk for utility workers and others.
  • FEMA: use a qualified electrician to install the appropriate equipment under local electrical codes, or ask your utility to install a power transfer switch.
  • Franklin: automatic or manual transfer switches must be used any time a generator is used as standby or backup on power lines, and contact the power company for use and approval.

A hardwired 230 V pump has no plug to move to a cord. Anker’s guide says hardwired pumps may require a qualified electrician and suitable transfer equipment. That applies to a power station too. Hire a licensed electrician for this work, and have the setup in place before the storm, not during it.

Carbon monoxide

Most portable generator incidents reported to CPSC involve CO poisoning from generators used indoors or in partially enclosed spaces. You cannot see or smell it. CPSC’s label says using a generator indoors can kill you in minutes.

  • Never run a generator inside a home, garage, basement, crawlspace or shed, even with fans or open doors and windows. CPSC says deadly levels can build up quickly and linger for hours after the generator shuts off. A well house is not an exception.
  • Keep the distance. CDC says more than 20 feet from any windows, doors and vents. CPSC adds to point the exhaust away from nearby buildings.
  • Install CO alarms. CPSC says battery-operated, or plug-in with battery backup, certified to the latest safety standards, with batteries tested monthly.
  • Know the symptoms. CDC lists headache, dizziness, weakness, upset stomach, vomiting, chest pain and confusion. If you start to feel sick, dizzy or weak, CPSC says get to fresh air right away.

Rain does not change this. I live in Washington, so wet outages are the normal case. CPSC says generators pose a shock risk in wet conditions, and to run one under an open, canopy-like structure on a dry surface where water cannot reach or puddle under it, never indoors or near openings. Refuel only after it is off and cooled down. The power station vs gas generator guide and portable generator guide go further on those trade-offs.

When a power station can do it

Two questions decide it: is the output 240 V, and does the surge rating clear the motor? These specs are from our catalog, which lists surge in watts. The last column compares that figure with the VA column above, so it is a paper check only. The catalog’s surge figures do not state a hold time or a voltage, and I found no manufacturer statement that any of these starts a named pump.

StationCapacityContinuousSurge240 VPaper check against 230 V rows
Jackery Explorer 5000 Plus5,040 Wh7,200 W14,400 WYesAll rows except 1.5 HP 2-wire
Anker SOLIX F38003,840 Wh6,000 W9,000 WYesThrough 1/2 HP 2-wire and 3/4 HP 3-wire
EcoFlow DELTA Pro 34,096 Wh4,000 W8,000 WYesSame rows, with only 134 to spare on 3/4 HP 3-wire
Anker SOLIX F3800 Plus3,840 Wh6,000 WNot listedYesCannot say
Pecron F5000LFP5,120 Wh7,200 WNot listedYesCannot say
Jackery HomePower 3600 Pro Max3,584 WhNot listedNot listedYesCannot say
BLUETTI AC200L2,048 Wh2,400 W3,600 WNot without stacking two unitsNo

A power station can be a fit when the pump is small, the station has true 240 V output, its surge rating clears your locked rotor figure, and the connection is transfer equipment an electrician installed.

It cannot do the job in these cases:

  • A 120 V station on a 230 V pump. Anker’s guide says this directly, including for its own 120 V S2000 and C2000 Gen 2.
  • A surge rating below your locked rotor figure. A generator may sag to 65% and still start the motor. I could not find a manufacturer saying a power station inverter will do the same, so I would not count on it.
  • A long outage with no way to recharge. Energy is not the first limit, though. The F3800’s 3,840 Wh divided by a 1/2 HP motor’s 960 W maximum is about four hours of pump run time, before conversion losses. At an assumed 10 GPM, that is about 2,400 gallons.
  • A hookup through a wall outlet. CPSC’s warning is written about generators. I treat backfeeding from a battery the same way.

A 115 V 1/2 HP motor is the easier case: 50.5 locked rotor amps as 3-wire and 64.4 as 2-wire, or 5,808 VA and 7,406 VA by my multiplication. The EcoFlow DELTA 3 Ultra at 7,200 W surge and the Jackery Explorer 2000 Plus at 6,000 W surge both clear only the 3-wire one on paper. EcoFlow lists the DELTA 3 Ultra as 120 V only, and our catalog lists no 240 V output for the Jackery.

Whichever backup you choose, a stored emergency water supply covers the day it fails. For the permanent version of this, see solar well pump. For the rest of the outage, the power outage checklist picks up from here.

What I am not adding

I am not printing a generic starting watts chart, because Franklin prints amps and kVA, and the arithmetic above is labeled as mine. I am not printing a generator pick, a transfer switch price or an installation cost, because I do not have sources I trust for them. I am not claiming any station starts your pump. The only proof is your pump, your wire run and a licensed electrician’s install.

Frequently Asked Questions

What size generator do I need for a well pump?
Franklin Electric's 2026 AIM manual lists minimum generator ratings by motor size. A 3-wire motor needs at least 2 kW at 1/2 HP, 3 kW at 3/4 HP, 4 kW at 1 HP, 5 kW at 1.5 HP and 7.5 kW at 2 HP. A 2-wire motor needs 3 kW, 4.5 kW, 6 kW and 7.5 kW through 1.5 HP. Those figures cover the motor only, so add anything else you plan to run.
Can I run a 240 V well pump on a 120 V generator?
No. A 230 V pump needs a 240 V source. Check that the generator has a 120/240 V output before you buy it. The older Honda EU7000is spec sheet I read, for example, lists 120/240 V with a 30 A 125/250 V locking outlet alongside its 120 V outlets.
Can I plug a generator into a wall outlet to run my well pump?
No. CPSC says never try to power house wiring by plugging the generator into a wall outlet, a practice known as backfeeding. It calls this extremely dangerous and an electrocution risk to utility workers and neighbors on the same transformer. OSHA says never attach a generator to a structure's electrical system unless a qualified electrician has installed it with a transfer switch.
Can a portable power station run a well pump?
Only some can. It needs 240 V output for a 230 V pump, and a surge rating that covers the motor's start. On paper, the Jackery Explorer 5000 Plus's 14,400 W catalog surge figure covers most of Franklin's motors through 2 HP. A 120 V station cannot run a 240 V pump directly, as Anker's own guide says. I have not tested any station on a pump.
How far from the house should a generator be?
CDC says to use generators outside, more than 20 feet from any windows, doors and vents. CPSC says to locate the unit outdoors and far from doors, windows and vents, with the exhaust pointed away from nearby buildings. Never run one inside a home, garage, basement, crawlspace or shed, even with fans running or doors open.
What order do I start the generator and well pump in?
Franklin says to always start the generator before turning on the motor, and always turn off the motor before shutting down the generator. It warns that the motor thrust bearing may be damaged if the generator coasts down with the motor running or runs out of fuel.